The serial number is normally located on the mount base body. In order to read it, it is required to rotate the RA body about 90°.
The serial number is normally located on the mount base body. In order to read it, it is required to rotate the RA body about 90°.
This issue may occur due to:
- windows updates
- COM PORT changing
- StarGo Software/Firmware mismatch
- Firmware corruption
In order to fix this issue it is suggested to donwnload from our Support Page the latest StarGo Software/Firmware release and perform a new, clean StarGo software installation.
After the software installation it must be performed the firmware upgrade.
This procedure has been shown in the following video.
In this article the doubtful user about the purchasing of the Linear or the M-uno D, can find a list of pro and cons of the two mounts.
The biggest benefit of the M-uno D compared to the Linear mount it is the possibility to avoid the Meridian Flip.
When a USB connection cable/Power supply sudden disconnection occurr during the Firmware Upgrade, the process fail. This can happen due to USB cable/Power supply low quality (that's why we reccomend to use the USB cable and Power Supply provided with the mount or with the StarGo) or for an accidental disconnection.
The StarGo WiFi chip use the ad-hoc protocol, that works in the peer to peer mode and it cannot works as a client.
When the Site & Location checkbox is activated, Skysafari send, during the connection with the StarGo, the data about the time and the location in order to update the internal StarGo location.
The Motorized Polar Alignment function has been designed to work with the Merlino Board. If the Merlino Board is not available, to manage the operation, both the StarGo AUX ports must be used. In this way is not possible to manage the focuser and the Motorized Polar Alignement via ASCOM at the same time. It would be only possible, after the Polar Alignment, take off one of the two cables to use the focuser. The motors for the Motorized Polar Alignment Function can only be assembled in the factory.
The StarGO with ESCAP P530 motors 12:1 ratio reducer can have a max slew speed of 0,5 deg per sec.
In case of faster slew speed needed it is suggested to use our Losmandy motor kit HS version (3 deg. per sec.) or HQ (1,5 deg. per sec.)
Avalon Instruments provide a power supply with a 5,5 mm external diameter, 2,1 mm internal diameter, that has been chosen due to his standard characteristichs, easy to find on the market and, above all, during the risk evaluation process, it has been noticed that in case of cable stretching, the connector can come out without any damages.
The following table shows the knobs rotation arc-minutes amount for a fine Polar Alignment adjustment with one full knob turn.
The best guiding performance with our belt driven mounts comes by using the lowest possible guiding speed ( 0,2 / 0,4 ) , the shortest possible guide exposure ( 1 sec is ok ) and the lowest possible RA/DEC pulse guide duration (300 / 600).
StarGo technical requirement: